Reports and Studies


Environmental Assessment Report (accessible)

The Toronto Transit Commission is committed to providing a website that is accessible to the widest possible audience.

The Environmental Project Report for the Line 2 East Extension is available as an accessible document in two volumes below. Some of the legacy documents below are not accessible. If you wish to view or receive a hard copy please contact us at sse@ttc.ca

Environmental Project Report - Volume 1 (PDF - 149 MB)

Environmental Project Report - Volume 2 (PDF - 38 MB)

Minister of the Environment and Climate Change Notice to Proceed with Transit Project (October 30, 2017)

Environmental Assessment Report

Scarborough Subway Extension Environmental Project Report, Addendum 1 (December 17, 2018)

Scarborough Subway Extension Environmental Project Report (November 17, 2017)

Cover, Errata, Statement of Qualifications and Limitations, Table of Contents, Acronym List and Glossary

Executive Summary

Chapter 1: Introduction

Chapter 2: Existing and Future Conditions

Chapter 3: Choosing the Preferred Alignment and Station-Bus Terminal Location

Chapter 4: Project Description

Plan and Profile Plates 1

Plan and Profile Plates 2

Chapter 5: Impacts, Mitigation Measures and Monitoring

Chapter 6: Future Commitments

Chapter 7: Communication and Consultation Process

Chapter 8: References

Appendix A-1: City Council Resolution

Appendix A-2: City Executive Committee Decision

Appendix A-3: City Council Resolution

Appendix B-1: Natural Heritage Report

Appendix B-2: Stormwater Management Report

Appendix B-3: Local Air Quality Assessment

Appendix B-4: Noise and Vibration Study

Appendix B-5: Potential Utility Impacts

Appendix B-6: Background Report Planning and Urban Design (Part 1)

Appendix B-6: Background Report Planning and Urban Design (Part 2)

Appendix B-7A: Stage 1 Archaeology Assessment (Part 1)

Appendix B-7A: Stage 1 Archaeology Assessment (Part 2)

Appendix B-7B: Cultural Heritage Memorandum

Volume 2: Cover Page, Appendix C-1, Summary of Public Comments

Appendix C-2: Summary of Public Comments Received During Phase 2

Appendix C-3: Summary of Public Comments Received During Phase 3

Appendix C-4: TPAP Public Consultation Report (Part 1)

Appendix C-4: TPAP Public Consultation Report (Part 2)

Appendix C-5: Technical Advisory Committee Consultation Documents

Appendix C-6: Government Review Consultation Documents

Appendix C-7: Indigenous Communities Consultation Documents

Appendix C-8: Notice of Completion

City Council Reports

Status Update: Toronto-Ontario Transit Responsibilities Realignment Review (June 12, 2019)

Toronto's Transit Expansion Program: Update and Next Steps - Supplementary Report (April 16, 2019)

Toronto's Transit Expansion Program: Update and Next Steps (April 3, 2019)

Line 2 East Extension Update (April 3, 2019)

Next Steps on the Scarborough Subway Extension (March 28, 2017)

Developing Toronto's Transit Network Plan to 2031 (July 12, 2017)

Scarborough Rapid Transit Options: Reporting on Council Terms and Conditions (October 8, 2013)

Scarborough Subway Options (July 2013)

City of Toronto Design Review Panel

Presentation to City of Toronto’s Design Review Panel (July 27, 2018)

Minutes (July 27, 2018)

City of Toronto’s Design Review Panel Presentation and Minutes (July 18, 2017)

Business Case

Line 2 East Business Case Analysis (City of Toronto - April 3, 2019)

 

X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm