Cross Section Image of Station Elevators

The TTC’s Easier Access Program is making subway stations accessible. Construction crews on behalf of TTC began construction work at King Station in January 2023.

This project will include:

  • Barrier-free path from the main entrance to all levels of the station including installation of:
  • Three elevators to be constructed (E1, E2, E3) to concourse and platform levels via the PATH
  • Accessible Paths include:
  • From Street level (King and Bay)
  • From Street level (Melinda)
  • Combined through Commerce Court Food Court
  • Accessible PRESTO fare line and automatic sliding doors 
  • Improved signage including wayfinding
  • CCTV – Security cameras
  • Public art installation as a part of the TTC Public Art Program

 

Learn more about how we’re making transit more accessible with TTC’s Easier Access program. All TTC Easier Access projects are reviewed by ACAT (Advisory Committee on Accessible Transit).
Temporary excavation at E3 Street Level for the installation of the vent shaft for the Melinda Exit closure.x
Temporary excavation at E3 Street Level for the installation of the vent shaft for the Melinda Exit closure.

Inside E2 hoarding at the southbound platform after completion of the abatement and removal of the enclosure

Inside E2 hoarding at the southbound platform after completion of the abatement and removal of the enclosure