Eglinton Station Bus Loop Rehabilitation
What we are doing and why
From Sunday, November 1, 2026, until late 2027, the TTC will be undertaking rehabilitation work in the Eglinton Station Bus Loop to improve the long-term condition and reliability of the facility.
Work area
Construction is anticipated to occur in multiple phases:
- Phase One: Work will take place on the east portion of the bus loop and at the entrance on Berwick Avenue.
-
Phase Two: Work will take place in Eglinton Station, in front of bus bay 4 by the bus platform.
- Phase Three: Work will take place at bus bay 4 by the bus loop building.
- Phase Four: Work will take place at the entrance on Berwick Avenue and at the exit on Duplex Avenue.

Work activities, hours and timeline
- Work will begin on Sunday, November 1, 2026, and is expected to be completed in late 2027.
- Work activities will include removing and rebuilding the bus loop surface, strengthening underground drainage infrastructure, and repaving the bus loop.
- Work will take place on a 24/7 basis. Crews will aim to conduct noisy activities, including concrete chipping, between 7 a.m. and 11 p.m.
- Fencing and hoarding will be in place around the work areas.
- Noise, dust, and vibration associated with construction should be expected in the bus loop area. Dust mitigation measures will be in place, including filter cloth and water mitigation.
Motorist, cyclist, and pedestrian impacts
- All work will be contained within the Eglinton Station Bus Loop.
- There are no traffic impacts expected as part of this work.
- The sidewalk on the north side of Berwick Avenue will be closed between Duplex Avenue and Yonge Street for the duration of work. Advanced signage will be in place to help direct pedestrians around the work area.
- Driveway access will be maintained.
TTC service adjustments - November 1, 2026, until late 2027 - Subject to change*
- Bus service will continue to operate through the Eglinton Station Bus Loop during construction.
- Temporary changes to bus routing into the bus loop and bus bay reallocations will be required.
- For up-to-date information regarding transit service changes, please visit
https://www.ttc.ca/service-advisories/Service-Changes.
Thank you for your patience as we work to improve transit infrastructure in Toronto.
Contact us
If you are interested in receiving updates about this project, please email your contact information to the project's TTC Community Liaison: